This section of our website provides detailed information for toolmakers to manufacture tools to PMS Specification
Is the location ring the correct diameter? 60mm (20 ton)
Is the location ring the correct diameter? 80mm (80 ton)
Are the clamping points the correct size and position?
Is the lifting strap appropriate?
Are all water fittings correct type and size?
Are the cavities clearly identified?
Does the tool fit in between tie bars? 250mm (20 ton)
Does the tool fit in between tie bars? 350mm (80 ton)
re all ejector pins and pushback pins the correct length?
Are the ejector pins around the spreader 0.4mm proud?
Are all cooling circuits stamped IN and OUT and numbered clearly?
Are all cooling circuits clear and tested for flow and leaks?
Is the nozzle seating the correct depth? 0.5mm - 1.0mm @ 45 deg.
Is the nozzle seating the correct diameter? 11.0mm (20 ton)
Is the nozzle seating the correct diameter? 16.0mm (80 ton)
Is the nozzle clearance the correct diameter? 45.0mm (20 ton)
Is the nozzle clearance the correct diameter? 60.0mm (80 ton)
Has the tool been stamped with tool No. on front and back subflush?
Are all fittings, where possible, sub-flush?
Are all side cores safely retained when in open position?
Ejection fully back, does the ejector bar measure? 194mm (80T)
Ejection fully back, does the ejector bar measure? 114mm (20T)
Do all moving parts run freely and are they lubricated?
Are all the guide pins & ejector guide pins lubricated?
Are all spare parts clearly stamped with tool No?
Is there enough clearance between the spray head and top of tool?
re the gates the correct size? 0.35 - 0.40mm